Library of Documents This page contains all of the pdf documents on this site for easy access and download. If you are unable to find the document you are looking for, please use the keyword search function at the top right of your screen or feel free to contact one of the Key Project Staff.
Complete List of Web Site Documents to Download | For ease of use, all pdf documents that are available for download on this site are listed below by category. Simply click on the category name and view all of the documents contained in this list. For more information about each document, click on the document name to view the brief document description and if you decide to download it or view it, please click on the pdf icon that appears beside each document name. |  Additional Tools/Documents
| This list contains addition tools/documents regarding this project that do not fall into one of the listed categories below. | Attorney General's Letter to York Region | Type: PDF Document Size: 262.23 KB Letter from Counsel for the federal Attorney General of Canada advising the Court that the Attorney General would be intervening in the matter and staying the private prosecution initiated by Mr. Jim Robb against the Region.
|
| Glossary of Sewer Terms | Type: PDF Document Size: 153.38 KB This is a guide of terms and phrases related to sewer and sanitation projects.
|
| The Minister's Conditions Letter October 1, 2004 | Type: PDF Document Size: 1.13 MB This document contains the Letter from Honourable Leona Dombrowski to York Region Commissioner Kees Schipper regarding the conditions imposed on York Region and the remaining unfinished YDSS projects from the MOE on October 1, 2004.
|
|
|  Holland Landing Sanitary Sewage Treatment Study
 Holland Landing Sanitary Sewage Treatment Study August 1995
Pages 1-25 | Type: PDF Document Size: 8.22 MB The Holland Landing Sanitary Sewage Treatment Study Phase 2 Report (August 1995) is part of the Class Environmental Assessment (EA) requirements. This report provides key information on the Holland Landing study including information on the current sanitary system, the problems addressed in this study, the amount of sewage that can be effectively manged, alternative means of managing sewage in the future, the procedure for evaluating alternatives, a preliminary recommendation of the preferred means of managing this system. This area contains pages 1-25 of the report.
|
| Pages 26-50 | Type: PDF Document Size: 6.07 MB The Holland Landing Sanitary Sewage Treatment Study Phase 2 Report (August 1995) is part of the Class Environmental Assessment (EA) requirements. This report provides key information on the Holland Landing study including information on the current sanitary system, the problems addressed in this study, the amount of sewage that can be effectively manged, alternative means of managing sewage in the future, the procedure for evaluating alternatives, a preliminary recommendation of the preferred means of managing this system. This area contains pages 26-50 of the report.
|
| Pages 51-75 | Type: PDF Document Size: 10.64 MB The Holland Landing Sanitary Sewage Treatment Study Phase 2 Report (August 1995) is part of the Class Environmental Assessment (EA) requirements. This report provides key information on the Holland Landing study including information on the current sanitary system, the problems addressed in this study, the amount of sewage that can be effectively manged, alternative means of managing sewage in the future, the procedure for evaluating alternatives, a preliminary recommendation of the preferred means of managing this system. This area contains pages 51-75 of the report.
|
| Pages 76-100 | Type: PDF Document Size: 9.22 MB The Holland Landing Sanitary Sewage Treatment Study Phase 2 Report (August 1995) is part of the Class Environmental Assessment (EA) requirements. This report provides key information on the Holland Landing study including information on the current sanitary system, the problems addressed in this study, the amount of sewage that can be effectively manged, alternative means of managing sewage in the future, the procedure for evaluating alternatives, a preliminary recommendation of the preferred means of managing this system. This area contains pages 76-100 of the report.
|
| Pages 101-125 | Type: PDF Document Size: 7.52 MB The Holland Landing Sanitary Sewage Treatment Study Phase 2 Report (August 1995) is part of the Class Environmental Assessment (EA) requirements. This report provides key information on the Holland Landing study including information on the current sanitary system, the problems addressed in this study, the amount of sewage that can be effectively manged, alternative means of managing sewage in the future, the procedure for evaluating alternatives, a preliminary recommendation of the preferred means of managing this system. This area contains pages 101-125 of the report.
|
| | Pages 151-175 | Type: PDF Document Size: 4.12 MB The Holland Landing Sanitary Sewage Treatment Study Phase 2 Report (August 1995) is part of the Class Environmental Assessment (EA) requirements. This report provides key information on the Holland Landing study including information on the current sanitary system, the problems addressed in this study, the amount of sewage that can be effectively manged, alternative means of managing sewage in the future, the procedure for evaluating alternatives, a preliminary recommendation of the preferred means of managing this system. This area contains pages 151-175 of the report.
|
| Pages 176-200 | Type: PDF Document Size: 3.37 MB The Holland Landing Sanitary Sewage Treatment Study Phase 2 Report (August 1995) is part of the Class Environmental Assessment (EA) requirements. This report provides key information on the Holland Landing study including information on the current sanitary system, the problems addressed in this study, the amount of sewage that can be effectively manged, alternative means of managing sewage in the future, the procedure for evaluating alternatives, a preliminary recommendation of the preferred means of managing this system. This area contains pages 176-200 of the report.
|
| Pages 201-225 | Type: PDF Document Size: 3.53 MB The Holland Landing Sanitary Sewage Treatment Study Phase 2 Report (August 1995) is part of the Class Environmental Assessment (EA) requirements. This report provides key information on the Holland Landing study including information on the current sanitary system, the problems addressed in this study, the amount of sewage that can be effectively manged, alternative means of managing sewage in the future, the procedure for evaluating alternatives, a preliminary recommendation of the preferred means of managing this system. This area contains pages 201-225 of the report.
|
| Pages 226-246 | Type: PDF Document Size: 635.67 KB The Holland Landing Sanitary Sewage Treatment Study Phase 2 Report (August 1995) is part of the Class Environmental Assessment (EA) requirements. This report provides key information on the Holland Landing study including information on the current sanitary system, the problems addressed in this study, the amount of sewage that can be effectively manged, alternative means of managing sewage in the future, the procedure for evaluating alternatives, a preliminary recommendation of the preferred means of managing this system. This area contains pages 226-245 of the report.
|
|
|  Holland Landing Sanitary Sewage Treatment Study May 1996
Pages 1-100 | Type: PDF Document Size: 6.51 MB The Holland Landing Sanitary Sewage Treatment Study Phase 2 Report (May 1996) is part of the Class Environmental Assessment (EA) requirements. This report provides key information on the Holland Landing study including information on the current sanitary system, the problems addressed in this study, the amount of sewage that can be effectively manged, alternative means of managing sewage in the future, the procedure for evaluating alternatives, a preliminary recommendation of the preferred means of managing this system. This area contains pages 1-100 of the report.
|
| Pages 101-200 | Type: PDF Document Size: 4.08 MB The Holland Landing Sanitary Sewage Treatment Study Phase 2 Report (May 1996) is part of the Class Environmental Assessment (EA) requirements. This report provides key information on the Holland Landing study including information on the current sanitary system, the problems addressed in this study, the amount of sewage that can be effectively manged, alternative means of managing sewage in the future, the procedure for evaluating alternatives, a preliminary recommendation of the preferred means of managing this system. This area contains pages 101-200 of the report.
|
| Pages 201-300 | Type: PDF Document Size: 5.03 MB The Holland Landing Sanitary Sewage Treatment Study Phase 2 Report (May 1996) is part of the Class Environmental Assessment (EA) requirements. This report provides key information on the Holland Landing study including information on the current sanitary system, the problems addressed in this study, the amount of sewage that can be effectively manged, alternative means of managing sewage in the future, the procedure for evaluating alternatives, a preliminary recommendation of the preferred means of managing this system. This area contains pages 201-300 of the report.
|
| Pages 301- 380 | Type: PDF Document Size: 3.46 MB The Holland Landing Sanitary Sewage Treatment Study Phase 2 Report (May 1996) is part of the Class Environmental Assessment (EA) requirements. This report provides key information on the Holland Landing study including information on the current sanitary system, the problems addressed in this study, the amount of sewage that can be effectively manged, alternative means of managing sewage in the future, the procedure for evaluating alternatives, a preliminary recommendation of the preferred means of managing this system. This area contains pages 301-380 of the report.
|
|
|
|  Municipal and Regional Planning Documents
East Gwillimbury Growth Projections Report to Committee - 2005 | Type: PDF Document Size: 377.79 KB This document is a report from the Town of East Gwillimbury that contains population, housing, employment & development growth projections based on the York Region Official Plan and the East Gwillimbury Growth Management Report from May 2004.
|
| | Holland Landing Community Septic Systems Study | Type: PDF Document Size: 5.82 MB The Holland Landing Community Septic Systems Study, August 1995, was prepared by Jagger Hims Limited to access the viability of long-term reliance on septic sytems in Holland Landing. Their results are summarized in the following report.
|
| Master Plan Update March 2002 | Type: PDF Document Size: 8.69 MB This is the Master Plan Update created by Earth Tech Canada Inc and MacViro Consultants Inc. This report was initiated to ensure continuted timely decision-making on this infrastructure.
|
| Vision 2026: Towards the Vision | Type: PDF Document Size: 1.68 MB Vision 2026 is York Region's Strategic plan. The report outlines key focus areas for the Region and its future partners by settling the context and providing the framework for more detailed corporate and business plans.
|
| York Durham Trunk Sewer Master Plan July 1997 | Type: PDF Document Size: 14.84 MB This is the Master Plan Update created by Earth Tech Canada Inc. and MacViron Consultants Inc. This report was initiated to ensure continued timely decision making on this infrastructure.
|
|
|  Presentations
June 20 2005 YR Presentation to EG Council | Type: PDF Document Size: 109.93 KB This document contains the presentation by York Region to the East Gwillimbury Council on June 20, 2005 explaining the scope of this EA review.
|
| February 2 2006 MMM presentation to EG Council | Type: PDF Document Size: 290.96 KB This document contains the presentation by Marshall Macklin Monaghan to the East Gwillimbury Council regarding the purpose and public consultation strategy for this EA review on February 2, 2006.
|
|
|  Project Maps
| This list of documents contains project maps. | |
|  Provincial Planning Documents
A Guide to Places to Grow | Type: PDF Document Size: 3.06 MB Places to Grow (November 2005), was created by the Ministry of Public Infrastructure Renewal and is a guide to the proposed growth plan for the Greater Golden Horseshoe area.
|
| Places to Grow | Type: PDF Document Size: 2.25 MB Places to Grow has been prepared under the Places to Grow Act, 2005. It is a framework for implementing the Government of Ontario's vision for building stronger, prosperous communities by better managing growth to 2031.
|
| | | Provincial Policy Statement | Type: PDF Document Size: 849.42 KB The Provincial Policy Statement provides policy direction on matters of provincial interest related to land use planning and development.
|
| The Greenbelt Plan | Type: PDF Document Size: 840.86 KB The Greenbelt Plan is a cornerstone of Ontario's proposed Greater Golden Horseshoe Growth Plan. This plan indentifies where urbanization should not occur in order to provide permanent protection to the agricultural land base and the ecological features and functions occuring on this landscape.
|
| The Oak Ridges Moraine Conservation Plan | Type: PDF Document Size: 173.87 KB The Oak Ridges Moraine Conservation Plan is an ecologically based plan established by the Ontario government to provide land use and resource management direction for the land and water within the Moraine.
|
|
|  Public Consultation
| November 8, 2005 MAG Summary | Type: PDF Document Size: 1.43 MB This document contains the Facilitator's Summary from the November 8, 2005 MAG meeting. The summary includes the presentations and discussions that occurred at this meeting.
|
| Newsletter - February 2006 | Type: PDF Document Size: 127.06 KB The following is the newsletter from February 2006, was sent to residents in the Study Area.
|
|
|  YDSS Extension to Holland Landing/Queensville Class EA
Class EA Report Part I | Type: PDF Document Size: 13.25 MB Regional Municipality of York - YDSS Extension to Holland Landing/Queensville Class EA (April 2000). This report was prepared by R.V. Anderson Associates Limited for the Regional Municipality of York to determine the preferred route alignment for extending the York-Durham Sewerage System to service approved communities of Holland Landing and Queensville.
|
| Class EA Report Part II | Type: PDF Document Size: 12.33 MB The following cotains the supporting documentation for the Holland Landing Class EA Report.
|
| Class EA Addendum | Type: PDF Document Size: 7.07 MB The following is the Addendum to the Class EA report. It was prepared to provide an update on the status of the Class EA for the proposed extension of the YDSS to Holland Landing and Queensville, Town of East Gwillimbury.
|
| |
|  York Region Policies & Reports to Council
T&W Report May 4, 2005 | Type: PDF Document Size: 1021.45 KB The following is the Transportation and Works Committe Report from May 4, 2005. The purpose of this report is to update Transportation and Works Committe and Regional Council on recent issues affecting the future development and servicing of the Queensville and surrounding areas and to discuss current planning issues.
|
| | Regional Council Meeting March 29, 2007 | Type: PDF Document Size: 293.08 KB This is a copy of the meeting minutes of the March 29, 2007 Regional Council Meeting on the York Region Preliminary Draft Sustainability Strategy.
|
| |
|  York Region State of the Environment Report 2005
| The below documents contain the sections of York Region's State of the Environment Report 2005. | York Region State of the Environment Report Introduction | Type: PDF Document Size: 402.49 KB York Region State of the Environment Report (Introduction) is a follow-up to the June 2000 report produced by York Region. This report seeks to provide an update on the current state of York Region's natural environments; describe the progress made on the 24 recommendations contained in the SOE 2000 Report; refine the land, water and air indicators used to monitor our environment; communicate trends where possible; describe the major environment initiatives undertaken by the Region and its partners from 2000-05; provide recommendations for future actions; and provide information so that those who live, work/play in YR can hlep take action to protect and restore the natural environment.
|
| | | | | | | | | | | | | | |
|  Wastewater Infrastructure Class Environmental Assessment Review & Addendum
| This is the Holland Landing Queensville Sharon Wastewater Infrastructure Class Environmental Assessment & Addendum - August 2007. Click below to download the full main text of the report. | | | | | | |
|  Wastewater Infrastructure Class Environmental Assessment Review & Addendum (by section)
| This is the Holland Landing Queensville Sharon Wastewater Infrastructure Class Environmental Assessment & Addendum - August 2007. The report has been separated into report sections for easier download. | | | | | | | | | | | | | | | | | |
|
|